COMPLETED PROJECTS

HT CONSUMER

S. No Description Name of the Client
1 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 1600 KVA Maximum Demand with Supply, Erection, Testing and Commissioning of HT VCB, 2500KVA Outdoor Oil Cooled Transformer, 600 KVA DG – 4 Nos & Main MV Panel, SSBs, Bus ducts, with all other Lighting panels with laying of all types of cables & cable trays. M/S. Kanam Latex Industries Pvt. Limited – Special Economic Zone, Nanguneri Taluk, Tirunelveli District.
2 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 600 KVA Maximum Demand with Supply, Erection, Testing and Commissioning of HT VCB, 1000KVA Dry type Transformer, 250KVA DG & 320KVA DG, Main MV Panel, SSB, Bus ducts, CCTV, DATA, Public address & Intercom with all other Lighting panels with laying of all types of cables & cable trays. "M/S. Aravind Krishna Hospital, Tirunelveli. Multi Storied Building Area: 70,000 Sq. ft"
3 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 600 KVA Maximum Demand with Supply, Erection, Testing and Commissioning of HT VCB, 1000KVA Dry Type Transformer, 500KVA DG – 2Nos, Main MV Panel, SSB, Raising mains, all other Lighting panels, Interior Workstation wiring work with CCTV, Telephone and Data with laying of all types of cables & cable trays. M/S. Pleasant Valley Services (P) Ltd, Thiruporur Taluk, Kancheepuram District.
Year of Completion:2022
Multi Storied Building Area: 65,000 Sq. ft
4 Designing and Approval of complete drawings and Safety Certificate from CEIG for HT VCB, 2000KVA Transformer, 500KVA DG, Main MV Panel, SSB all other Lighting panels & Getting EB supply of 1600KVA Maximum Demand from TNEB. M/S. Periyasamy Pillai Educational Trust, Sriperumbudur Taluk, Kancheepuram District.
Year of Completion:2022
Multi Storied Building Area: 300,000 Sq. ft
5 Design and Supply, Erection, Testing and Commissioning of 180 KVA DG, Main MV Panel, Distribution boards and all Light fittings with CCTV, Public address & Intercom and laying of all types of LT cables & cable trays. M/S. Krishna Scans,
Tirunelveli G.H. Campus,
Tirunelveli.
Year of Completion:2022
6 Designing and Getting EB supply of 160 KVA Maximum Demand with Supply, Erection, Testing and Commissioning of HT VCB, 250KVA Transformer, 200KVA DG, Main MV Panel, SSB all other Lighting panels with CCTV, Public address & Intercom and laying of all types of cables & cable trays. M/S. Nivin Krishna Enterprises,
Nellore. A.P.
Year of Completion:2022
7 Erection, Testing and Commissioning of interior and exterior lighting points, circuits, DB’s, cable trays, & cables with regular maintenance of VCB, 11 KV / 433 V 1000 KVA dry type transformer with 500 KVA DG set – 2 nos, MV panel and capacitor panels. M/S. Pothys Swarnamahal,
Thiruvandrum, Kerala
Year of Completion:2022
8 Designing and Approval of complete drawings and safety certificate from CEIG & Getting 400 KVA Additional Maximum Demand with Supply, Erection, Testing and Commissioning of 1000 KVA transformer,3 Panel VCB, Bus Ducts, HT Cables, MV panels, APFCR, SSB all other Lighting panels with laying of all types of cables & cable trays. M/s. Muruga Crusher,
Kamuthi, Ramanathapuram.
Year of Completion:2022
9 Addition & Alteration Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 125 KVA Additional Maximum Demand with Supply, Erection, Testing and Commissioning of 250KVA DG, Main MV Panel, SSB all other Lighting panels with laying of all types of cables & cable trays. M/S. Super Sea Food Products Private Limited,
Kattalankulam Village, Thoothukudi.
Year of Completion:2022
10 Erection, Testing and Commissioning of interior and exterior lighting points, circuits, DB’s, cable trays, & cables with regular maintenance of 2000 KVA – 2 nos. 11 KV / 433 V dry type transformer with 2000 KVA DG set – 2 nos, MV panel and capacitor panels. M/S. Pothys, Ernakulam, Cochin.
Year of Completion:2021
Multi Storied Building Area: 3,50,000 Sq. ft
11 Erection, Testing and Commissioning of interior and exterior lighting points, circuits, DB’s, cable trays, & cables with Regular maintenance of 1250 KVA – 2 nos. 11 KV / 433 V dry type transformer with 1250 KVA DG set – 2 nos, MV panel and capacitor panels. M/S. Pothys Private Limited, Chrompet, Chennai.
Year of Completion:2021
Multi Storied Building Area: 2,50,000 Sq. ft
12 Addition and Alteration of complete drawings and safety certificate from CEIG for Main MV Panels, Sub Panels, UPS and Erection, Testing and Commissioning of Main MV Panels, Sub Panels, UPS and all other Lighting panels with laying of all types of cables & cable trays. M/S. Pothys Swarnamahal, Tirunelveli Town, Tirunelveli.
Year of Completion:2021
13 Designing and Approval of complete drawings and Safety Certificate from CEIG & Getting EB supply of 160KVA Maximum Demand with Supply, Erection, Testing and Commissioning of 500 KVA transformer, 125KVA DG, HT VCB, HT Cables, MV panels, APFCR, SSB all other Lighting panels with laying of all types of cables & cable trays. M/S. Gamma Tech(India) Private Limited, Kayathar, Thoothukudi.
Year of Completion:2021
14 Designing and Execution of complete drawings and Approval from TNEB for 250KVA Transformer, Main MV Panels, Sub Panels, and Erection, Testing and Commissioning of All Electrical Panels and all other Lighting panels with laying of all types of cables & cable trays. M/S. Tirunelveli New Bus stand, Tirunelveli.
Year of Completion:2021
15 Addition and Alteration of complete drawings and safety certificate from CEIG for Main MV Panels, Sub Panels, Motor Control Panels and Erection, Testing and Commissioning of All Control Panels. M/S. Kanam Latex Industries Private Ltd., Peruvilai, Nagercoil
Year of Completion:2021
16 Designing and Approval of complete drawings and safety certificate from CEIG for 250KVA Transformer, Main MV Panels, Sub Panels, Motor Control Panels and Erection, Testing and Commissioning of All Control Panels. M/S. Geetha Enterprises, Gangaikondan, Tirunelveli.
Year of Completion:2021
17 Designing and Approval of complete drawings and Safety Certificate from CEIG & Getting EB supply of 800KVA Maximum Demand with Supply, Erection, Testing and Commissioning of 1000 KVA transformer, HT VCB, HT Cables, MV panels, APFCR, SSB all other Lighting panels with laying of all types of cables & cable trays. M/S. NRSM Blue Metal, Omanallur Village, Tirunelveli.
Year of Completion:2021
18 Addition and Alteration of complete drawings and safety certificate from CEIG for Main MV Panels, Sub Panels, Motor Control Panels and Erection, Testing and Commissioning of All Control Panels. M/S. Kanam Latex Industries Private Ltd., A.N.Kudy, Nagercoil
Year of Completion:2021
19 Addition & Alteration Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 590 KVA Additional Maximum Demand with Supply, Erection, Testing and Commissioning of 630A HT VCB, 1250KVA Transformer, Main MV Panel, SSB all other Lighting panels with laying of all types of cables & cable trays. M/S. Hameed Marine (P) Ltd, Tirunelveli.
Year of Completion:2021
20 Addition and Alteration of complete drawings and safety certificate from CEIG for 60A Harmonics Panel, Main MV Panels, Sub Panels, Motor Control Panels and Erection, Testing and Commissioning of All Control Panels. M/S. Alpha Minerals and Chemicals, Pottal Village, Tirunelveli
Year of Completion:2020
21 Addition and Alteration of complete drawings and safety certificate from CEIG for 75 KW & 78 KW Solar Plant, Control Panels and 380KVA DG Set, UPS, Fire Control Panel and Erection, Testing and Commissioning of All Control Panels. M/S. Kanam Latex Industries Private Ltd., Kavalkinaru, Tirunelveli
Year of Completion:2019
22 Designing and Approval of complete drawings and Safety Certificate from CEIG & Getting EB supply of 300KVA Maximum Demand with Supply, Erection, Testing and Commissioning of 500 KVA transformer, HT Cables, MV panels, APFCR, SSB all other Lighting panels with laying of all types of cables & cable trays. M/S. Saravana Blue Metal, Gangaikondan, Tirunelveli.
Year of Completion: 2019
23 Addition & Alteration Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 160 KVA Additional Maximum Demand with Supply, Erection, Testing and Commissioning of SSB all other Lighting panels with laying of all types of cables & cable trays. M/S. Hameed Marine (P) Ltd, Tirunelveli.
Year of Completion:2019
24 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 750KVA Maximum Demand with Supply, Erection, Testing and Commissioning of 1000 KVA transformer, 500 & 160 KVA DG, HT Cables, MV panels, APFCR, SSB all other Lighting panels with laying of all types of cables & cable trays. M/s. Muruga Crusher, Kamuthi, Ramanathapuram District.
Year of Completion:2019
25 Addition & Alteration Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 1087 KVA Maximum Demand with Supply, Erection, Testing and Commissioning of 2000 KVA transformer, 625 & 1010 KVA DG, HT Cables, MV panels, APFCR, SSB all other Lighting panels with laying of all types of cables & cable trays. M/s.Padanilam WelFare Trust,
Velayudhan Pillai Memorial Complex,
Cancer Institute Block, Kulasekharam,
Kanyakumari District-629 161.
Multi Storied Building Area: 5,00,000 Sq. ft
26 Addition and Alteration of complete drawings and safety certificate from CEIG of 99 KW Solar Plant, Control Panels and DG with Erection, Testing and Commissioning of MV Panel Extension and Control Panels. M/s. Gee Gee Kay Private Limited, Chemical Industry, Thoothukudi.
Year of Completion:2019
27 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 600KVA Maximum Demand with Supply, Erection, Testing and Commissioning of 800 KVA transformer, 750 & 82.5 KVA DG, HT Cables, MV panels, APFCR, SSB all other Lighting panels with laying of all types of cables & cable trays. M/s.Jenefa India, Fish meal & oil plant, Tuticorin,
Year of Completion:2018
28 Designing and Approval of complete drawings Following EB supply of 450 KVA Maximum Demand with Supply, Erection, Testing, installation and Commissioning of 630KVA USS, 625 KVA DG, HT Cables, MV panels, APFCR, MPP, SPP all other Lighting panels with laying of all types of cables & cable trays and HT Termination Kits with interior and exterior lighting points, circuits with the complete regular Maintenance. M/S . Apurva Super Store, Textile Showroom, Tripathi.
Year of Completion:2019
Multi Storied Building Area: 65,000 Sq. ft
29 Erection, testing and commissioning of interior and exterior lighting points, circuits, DB’s, cable trays, & cables with regular maintenance of 1600 KVA – 2 nos. 11 KV / 433 V dry type transformer with 1500 & 2080KVA DG set, MV panel and capacitor panels. M/s. Pothys, Salem.
Year of Completion:2019
Multi Storied Building Area: 1,45,000 Sq. ft
30 Erection, testing and commissioning of interior and exterior lighting points, circuits, DB’s, cable trays, & cables with regular maintenance of 1600 KVA. 11 KV / 433 V dry type transformer with 1010 & 250 KVA DG set, MV panel and capacitor panels. M/s. Pothys, Bangalore.
Year of Completion:2019
Multi Storied Building Area: 88,000 Sq. ft
31 Addition and Alteration of complete drawings and safety certificate from CEIG & Getting EB supply of 2000KVA Demand with Supply, Erection, Testing and Commissioning of HT cables, DP Structure and HT Termination Kits. M/s. Thanjavur Medical College, Thanjavur.
Year of Completion:2018
Multi Storied Building Area: 1,50,000 Sq. ft
31 Addition and Alteration of complete drawings and safety certificate from CEIG & Getting EB supply of 2000KVA Demand with Supply, Erection, Testing and Commissioning of HT cables, DP Structure and HT Termination Kits M/s. Thanjavur Medical College, Thanjavur.
Year of Completion:2018
Multi Storied Building Area: 1,50,000 Sq. ft
32 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply of 1600KVA Demand with Supply, Erection,Testing and Commissioning of HT cables, DP Structure and HT Termination Kits. M/s.Superspeciality Hospital
Block for Tirunelveli Medical College, Tirunelveli
Year of Completion:2018
Multi Storied Building Area: 1,50,000 Sq. ft
33 Erection, testing and commissioning of interior and exterior lighting points, circuits with the complete regular Maintenance of 2000 KVA – 11 KV / 433 V dry type transformer with 2 nos. of 1250 KVA DG. M/S . Pothys Trichy
Year of Completion:2017
Multi Storied Building Area: 1,10,000 Sq. ft
35 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply. Erection, Installation,testingand commissioning of 500 KVA transformer,500 KVA DG, HT Cables, MV panels, APFCR, MPP, SPP all other Lighting panels with laying of all types of cables & cable trays. M/s. Shifa Hospitals, Tirunelveli
Year of Completion:2017
35 Addition and Alteration of complete drawings and safety certificate from CEIG & Getting EB supply. Erection, Installation,testingand commissioning of 630 KVA transformer,625 KVA DG, 3 Panel VCB, HT Cables, MV panels, LT Kiosk Panel, APFCR, MPP, SPP all other Lighting panels with laying of all types of cables & cable trays. M/S. Hameed Marine(P) Ltd, Tirunelveli.
Year of Completion:2016
36 Erection, testing and commissioning of interior and exterior lighting points, circuits with the complete regular Maintenance of 1600 KVA –11 KV / 433 V dry type transformer with 1010,1010& 250 KVA DG set. M/S. Pothys, Nagercoil.
Year of Completion:2016
Multi Storied Building Area: 90,000 Sq. ft
37 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply. Erection, Installation, testing and commissioning of 1000 KVA transformer, VCB, HT Cables, MV panels, APFCR, MPP, SPP & all other Lighting panels with laying of all types of cables & cable trays. M/S Pearl city Marine Products Pvt. Ltd., Tuticorin.
Year of Completion:2016
38 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply. Erection, Installation, testing and commissioning of 500 KVA transformer, 200 KVA DG - 2No’s, 125 KVA DG, HT Cables, MV panels, APFCR, MPP, SPP all other Lighting panels with laying of all types of cables. M/s. Menaka cards Tirunelveli
Year of Completion:2016
39 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply for 630 KVA Transformer Load. M/S.Romana DistilleryIndustries (P)Ltd. Tirunelveli.
Year of Completion:2016
40 Designing and Approval of Addition and Alteration of drawings and safety certificate from CEIG and completed numerous works like laying of cables, cable trays, supply of panels, switches and fire alarm works. M/s. Bosch Limited, Sipcot Industrial Growth Center, Gangaikondan, Tirunelveli.
Year of Completion:2016
41 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply. Erection, Installation, testing and commissioning of 500KVA transformer, VCB, Raising Main, MV panels, APFCR, MPP, SPP & all other Lighting panels with laying of all types of cables & cable trays. Laying of HT and LT cables on underground trench and horizontal & Vertical cable trays for more than 2500 meters. M/S. Padanilam Welfare Trust, Kanyakumari.
Year of Completion:2016
42 Designing and Approval of complete drawings and safety certificate from CEIG. Erection, Installation, testing and commissioning of 315KVA transformer, VCB, MV panels, MPP, SPP & all other Lighting panels with laying of all types of cables. M/S. Kurian Abraham(P) Ltd, Nagercoil.
Year of Completion:2016
43 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB Supply. Erection, Installation, testing and commissioning of 500KVA transformer, Double Pole structure, 200, 160 & 125KVA DG, MV panels, APFCR, MPP, SPP & all other Lighting panels with laying of all types of cables & cable trays to the machines. Erection of High bay Lighting of more than 50 nos. and Lightning arrestor above the height of 20 meters. M/S. Globe Radio Company, Gangaikondan SIPCOT Tirunelveli.
Year of Completion:2015
44 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB Supply. Erection, Installation, testing and commissioning of 630KVA transformer, Douple Pole structure, 500 KVA DG, MV panels, APFCR, MPP, SPP & all other Lighting panels with laying of all types of cables & cable trays to the machines. M/S. Hameed Marine(P) Ltd, Tirunelveli.
Year of Completion:2015
45 Designing and Approval of complete drawings and safety certificate from CEIG & Getting EB supply. Erection, Installation, testing and commissioning of 500 KVA transformer, Double Pole structure, MV panels, MPP, SPP & all other Lighting panels with laying of all types of cables. M/S Kanam Latex Industries Private Ltd., Tirunelveli
Year of Completion:2016
46 Erection, testing and commissioning of interior and exterior lighting points, circuits, DB’s, cable trays, cables with the complete regular Maintenance of 1250 KVA – 11 KV / 433 V dry type transformer with 1010,750& 250 KVA DG set. M/S. Pothys Hyper Chennai
Year of Completion:2015
47 1600 KVA Indoor substation 11 KV / 433 V dry type transformer 24 hrs. Power backup.Erection, testing and commissioning of MV panel and control panels, cable trays, cables. Designing of capacitor panels. Panel board and cabling two 750 KVA DG set. Electrical inspection and Approval from CEIG.Regular maintenance. M/S. Pothys Chennai.
48 1000 KVA Unitized substation 11 KV / 433 V dry type transformer 24 hrs. Power backup.Erection, testing and commissioning of MV panel and control panels, cable trays, cables. Designing of capacitor panels. Panel board and cabling one 600 KVA DG set.Electrical inspections and approval from CEIG.Regular maintenance. M/S. Pothys Tirunelveli.
49 1600 KVA Unitized substation 11 KV / 433 V dry type transformer 24 hrs. Power backup. Erection, testing and commissioning of MV panel and control panels, cable trays, cables. Designing of capacitor panels. Panel board and cabling two 750 KVA DG set. Electrical inspection and approval from CEIG.Regular maintenance. M/S. Pothys Madurai
50 1600 KVA Unitized substation 11 KV / 433 V dry type transformer 24 hrs. Power backup.Erection, testing and commissioning of MV panel and control panels, cable trays, cables.Designing of capacitor panels.Electrical inspection and approval from CEIG Panel board and cabling two 750 KVA DG set. Regular maintenance M/S. Pothys Coimbatore
51 Addition of 1000 KVA Unitized substation 11 KV / 433 V dry type transformer 24 hrs. power backup. Erection, testing and commissioning of MV panel and control panels, cable trays, cables.Designing of capacitor panels.Panel board and cabling two 625 KVA DG set. Electrical inspection and approval from CEIG.Regular maintenance. M/S . Pothys Tirunelveli
52 Erection, testing and commissioning of interior and exterior lighting points, circuits, DB’s, cable trays, & cables with regular maintenance of 1250 KVA – 2 nos. 11 KV / 433 V dry type transformer with three sets of 625 KVA DG set, MV panel and capacitor panels. M/S . Pothys Trivandrum
53 Erection, testing and commissioning of interior and exterior lighting points, circuits, DB’s , cable trays & cables with regular maintenance of 1600 KVA – 11 KV / 433 V dry type transformer with two sets of 625 KVA DG set, MV panels & Capacitor panels. M/S . Pothys Boutique Chennai.
54 Erection, testing and commissioning of interior and exterior lighting points, circuits, DB’s , cable trays & cables with regular maintenance of 1600 KVA – 11 KV / 433 V dry type transformer with two sets of 725 KVA DG set, MV panels & Capacitor panels. M/S . Pothys Puducherry